Aerial view of the Solarex headquarters in La Tour Koenig, Pointe aux Sables, with its rooftop solar installation
All Projects Project — Experience Center

Experience Center Pointe aux Sables

Our Pointe aux Sables headquarters runs on the very systems we sell — a C&I rooftop installation powering the offices, showroom and EV chargers every day.

— Description

Powered by our own systems.

Our headquarters at La Tour Koenig, Pointe aux Sables, doubles as a working showcase: the offices, workshop and showroom all run on the equipment we design and install for our clients.

Commissioned in 2019 and substantially upgraded in March 2026, the installation has grown alongside our expertise — today 50 bifacial panels feed a 55 kW inverter bank backed by 70 kW of battery storage, running the building's air conditioning and three car chargers.

Inverter 55 kW
Battery 70 kW
Solar Array 31 kW · 50 panels
Location Pointe aux Sables
— System Evolution

From 2019 to today.

Initial configuration · 2019

30 kWInverter
30 kWBattery
10 kWSolar
Main equipment
  • Aircon 70,000 BTU
  • Aircon 24,000 BTU
  • Aircon 18,000 BTU
  • Aircon 12,000 BTU
  • Charger 7 kW

Upgrade · March 2026

55 kWInverter
70 kWBattery
31 kWSolar

50 bifacial panels · 620 W each

Main equipment
  • Aircon 70,000 BTU
  • Aircon 24,000 BTU
  • Aircon 18,000 BTU
  • Aircon 12,000 BTU
  • Car charger 7 kW
  • Car charger 11 kW
  • Car charger 2 kW
— Planning a C&I project?

Power your business.

From offices to warehouses, we design rooftop solar that cuts operating costs for decades. Come and see our own installation working at Pointe aux Sables.

Solarex Assistant

Online · Powered by AI
Hi! I'm Sora, your Solarex assistant. How can I help you today?